Industrial Downtime Cost Calculator.
Built for the meeting after the meeting.
Industry-benchmarked hourly downtime costs across 10 industrial verticals. Slide your unplanned hours per month, pick a scenario, see the loss over 30 / 90 / 180 / 365 days. Sensitivity matrix shows what changes if your inputs are ±25% off — so the number survives the CFO's first challenge. Calibrated for mid-market operations across South Africa, Nigeria, Kenya, Zambia, Ghana, India, Brazil, GCC, Australia, and Southeast Asia.
Tell us your industry and where you operate. We use this to pre-fill benchmark data for your market.
Select an industry to continue.
Methodology + sources.
Hourly cost benchmarks
Siemens True Cost of Downtime 2024 + ARC Advisory + Aberdeen, calibrated to mid-market asset profiles. Gold mining $35k/hr, copper $42k/hr, auto tier-2 $80k/hr, dairy $15k/hr. Editable to your actual figure.
Scenario brackets
Conservative (0.75× your cost estimate), base (as-entered), aggressive (1.25×). Bracketing the answer is what makes a downtime figure defensible when the CFO challenges the input.
Sensitivity matrix
Annual exposure across ±25% on hours/month and ±25% on cost/hour. The grid answers "what if I am wrong on the inputs" before the CFO asks it.
Window-based loss
Choose 30, 90, 180, or 365 days. 90 days defaults to "next board meeting" framing — the time horizon CFOs actually plan against.
PdM recovery range
Production deployments of predictive maintenance recover 20–35% of unplanned downtime in year one. Vendor pitches typically promise 50%+. We default to the realistic estimate, not the marketing one.
Questions about this tool.
Why is dairy processing only R15k/hr but mining R35k/hr?+
Asset criticality concentration. A single dairy line can be replaced or rerouted; a gold mill stop halts the entire operation. The benchmark hourly costs reflect what one hour of stoppage actually costs the operation, not the underlying value per output unit.
Is the per-hour cost the same as lost revenue?+
No — it is broader. Includes (a) lost contribution margin on output not produced, (b) overtime on recovery, (c) wasted raw materials, (d) downstream knock-on effects, (e) customer-side penalties. For most operations the cost is 1.5–3× the simple lost-revenue figure.
Why scenarios instead of a single number?+
A single number is what every other calculator on the internet shows. It also gets challenged the moment a CFO sees it. A scenario range (conservative / base / aggressive) plus a sensitivity matrix is what gets a downtime figure through a finance review — and what gets predictive-maintenance capex approved.
Does this include planned downtime?+
No — only unplanned. Planned maintenance, scheduled changeovers, and capex windows are not included because they are not the target of predictive maintenance. The point is to convert unplanned (expensive, disruptive) downtime into planned (cheap, scheduled) downtime.
Why is auto tier-2 so high?+
Two reasons: OEM contracts (BMW, Toyota, Mercedes, Ford SA) include severe penalty clauses for line-stop events at the OEM that trace back to a tier-2 supplier, and JIT delivery cadence means downtime cascades downstream within hours. The R80k/hr captures both.
Get the version we use in audits.
The Foundry Cortex Readiness Audit uses an extended version of this calculator — calibrated to your operation's asset estate, data quality, and vendor stack.
Run the readiness audit →